SAP C-IBP-2305 Exam Syllabus Topics:

TopicDetails
Topic 1
  • Optimize the integration scenarios and architecture of your planning solution
  • Solution Architecture & Data Integration
Topic 2
  • Define and view information with user-defined charts and dashboards
  • Configure and use Planning Operators to automate processes in your planning model
Topic 3
  • General Configuration of a Planning Area
  • Create and use key figures and attributes to model the supply chain

 

NEW QUESTION # 32
You are reviewing the master data types that are often used for supply and inventory planning
.Which master data types are compound master data types?Note: There are 2 correct answers to this question.

  • A. SOURCECUSTOMER
  • B. SOURCEPRODUCTION
  • C. SOURCELOCATION
  • D. SOURCECUSTGROUP

Answer: A,C


NEW QUESTION # 33
SAP IBP ensures interoperability with which applications?Note: There are 2 correct answers to this question.

  • A. User management in SAP Success Factors
  • B. Salesforce Sales Cloud
  • C. Business Network in SAP Ariba
  • D. Financial Planning in SAP Analytics Cloud

Answer: C,D


NEW QUESTION # 34
The S&OP Operator Profiles app is used to configure different types of algorithms.Which algorithm-specific settings are unique for only the Time Series-based Supply Optimizer?Note: There are 2 correct answers to this question.

  • A. Global cost factors
  • B. Processing mode
  • C. Time profile level
  • D. Discretization

Answer: A,B


NEW QUESTION # 35
Which of the following checks for master data and key figures does the Check Mode algorithm trigger?Note: There are 3 correct answers to this question.

  • A. It checks whether the required planning level master data exists for a subset of input key figures.
  • B. It checks whether the location resource specified in the master data forms a cycle in the supply chain network.
  • C. It checks whether the sourcing in the Production Source Item Master Data type exists.
  • D. It checks whether the heuristic detects cycles formed by nodes (such as location products) in the supply chain network.
  • E. It checks whether the location products specified in the master data are connected by customer sourcing rules within the supply chain network.

Answer: A,D,E


NEW QUESTION # 36
Which of the following key functions are supported by SAP IBP for sales and operations?Note: There are 2 correct answers to this question.

  • A. Multi-Level Supply Planning Heuristics
  • B. Simple statistical forecast
  • C. Scenario analysis for operational supply planning
  • D. Time series analysis

Answer: A,B


NEW QUESTION # 37
You need to create time periods for the time profile in a planning area.What should you be aware of when running the Create Time Periods application job?

  • A. The assigned Planning Area must be active.
  • B. In the Parameter Section of the application job, choose the Time Profile ID and Planning Area.
  • C. A time profile has to be activated so that the application job can proceed.
  • D. This application job can be run for multiple time profiles at once.

Answer: B


NEW QUESTION # 38
For your project, you create a new planning area and consider how to create analytics and alerts for it.How can you create these objects?

  • A. Use the option for copying analytics and alerts when creating a new planning area from the sample SAPIBP1.
  • B. Create analytics and alerts in the new planning area from scratch using the Intelligent Visibility application.
  • C. Use the option for copying analytics and alerts into the new planning area from the existing custom planning area.
  • D. Merge analytics and alerts into a new planning area from any sample planning area.

Answer: A


NEW QUESTION # 39
What is taken as an input for the demand sensing process?Note: There are 2 correct answers to this question.

  • A. Open Sales Orders
  • B. Results of time series analysis
  • C. Consensus Demand
  • D. Forecast Accuracy measures

Answer: A,C


NEW QUESTION # 40
Which functional capabilities are included in SAP IBP for response and supply?Note: There are 2 correct answers to this question.

  • A. Analyze Supply Usage
  • B. Detailed Production Scheduling
  • C. Planning with Product Allocations
  • D. Gating Factors

Answer: A,D


NEW QUESTION # 41
What are some of the prerequisites for configuring a planning area that results in a successful consistency check?Note: There are 2 correct answers to this question.

  • A. Specify a planning horizon in the planning area for each level of the assigned time profile.
  • B. Assign the compound master data type and its component master data types.
  • C. Configure at least one calculated key figure for the planning area.
  • D. Configure at most two input key figures on the same planning level in a key figure calculation.

Answer: A,B


NEW QUESTION # 42
You want to maintain key figure values for a new attribute and value combination, using SAP IBP, Add-in for Microsoft Excel, and are receiving an error related to missing combinations.How can you resolve this problem?Note: There are 2 correct answers to this question.

  • A. Use the Check Mode operator to create the combinations
  • B. Use the Data Integration app to load suitable data that creates the combinations
  • C. Use the option New Planning Object in the SAP IBP, add-in for Microsoft Excel
  • D. Use the Manage Master Data app to create the combinations

Answer: B,D


NEW QUESTION # 43
You have set up a planning area, and data is now available. You adjust the necessary time profile settings and run a consistency check.Which settings can you change and still run a successful consistency check?Note: There are 2 correct answers to this question.

  • A. Add a new time profile level to the time profile.
  • B. Change the past and future horizon of the levels in the time profile.
  • C. Change the description of the attributes in the time profile.
  • D. Change the numbering hierarchy of the period IDs in the time profile.

Answer: B,C


NEW QUESTION # 44
What are some of the available ABC segmentation methods in SAP IBP?Note: There are 2 correct answers to this question.

  • A. By Number of Items (Sorted Values)
  • B. By Number of Items (Sorted Average)
  • C. By Pareto Principle (Sorted and Calculated Values)
  • D. By Pareto Principle (Sorted and Cumulated %)

Answer: A,C


NEW QUESTION # 45
Which of the following are valid use cases for using the Realignment App?Note: There are 2 correct answers to this question.

  • A. Removing outliers from the sales history of a reference product before transferring its sales to a new product
  • B. Changing customer sources and reassigning customers to new DCs
  • C. Using the realignment run to identify obsolete data
  • D. Merging two locations into a new location

Answer: B,D


NEW QUESTION # 46
Which constraints are taken into account by the Time-Series-Based Supply Planning Heuristic (Infinite)?Note: There are 3 correct answers to this question.

  • A. Transportation lead times
  • B. Maximum lot size
  • C. Minimum lot size
  • D. Adjusted transport receipts
  • E. Aggregated constraints

Answer: A,B,D


NEW QUESTION # 47
You want to display and edit data in different Units of Measure (UOM).Which of the following must you consider before you use the UOM?Note: There are 3 correct answers to this question.

  • A. Analytics provide the user with the option to select the target unit of measure.
  • B. Units of measure are usually not time-independent.
  • C. Unit of measure is an attribute of a master data type, such as Product.
  • D. Units of measure are usually not time-dependent.
  • E. Conversion to the target unit of measure is handled by SAP IBP Excel UI

Answer: A,C,D


NEW QUESTION # 48
For which of the following application jobs can you enter planning filters as parameters?Note: There are 2 correct answers to this question.

  • A. Purge Master Data
  • B. Create Time Periods for Time Profiles
  • C. Purge Non-Conforming Data
  • D. Purge Key Figure Data

Answer: A,D


NEW QUESTION # 49
Safety Stock outputs from Multistage Inventory Optimization are sent to which of these processes? Note:
There are 2 correct answers to this question.

  • A. Supply Heuristics in SAP IBP for sales and operations
  • B. Demand Sensing with Gradient Boosting (Full)
  • C. Decoupling Points determination in SAP IBP for demand-driven replenishment
  • D. Charts creation in SAP Supply Chain Control Tower

Answer: A,B


NEW QUESTION # 50
You are working on a mid-range plan that spans the seasonal peak and you are evaluating the need for additional crewing.Which of the following parameters can you model to plan production with extra shift(s)?

  • A. Adjusted production interactive values
  • B. Production source validity at the start of seasonal peak
  • C. Capacity expansion with additional costs
  • D. Incremental production values

Answer: C