Give Push to your Success with BICSI Certification RCDDv14.1 Exam Questions
RCDDv14.1 100% Guarantee Download RCDDv14.1 Exam PDF Q&A
NEW QUESTION 135
One of the constituent project managers asks a new program manager to obtain approval for an additional key project requirement. A tolerance range is set, if the tolerance range is too narrow on a program what effect will multiple minor changes have on the program?
- A. Degradation of program communications
- B. Reduction in program quality
- C. Reduction in program risk
- D. Slow down in program implementation
Answer: D
NEW QUESTION 136
What is the MINIMUM lighting requirement for telecommunications spaces?
- A. 500 lux (46 foot-candles) of lighting in the horizontal plane and 200 lux (18.6 foot-candles) of lighting in the vertical plane measured at 1 meter (3.28 feet) above the finished floor
- B. 500 lux (46 foot-candles) of lighting in the horizontal plane and 500 lux (46 foot-candles) of lighting in the vertical plane measured at 1 meter (3.28 feet) above the finished floor
- C. 200 lux (18.6 foot-candles) of lighting in the horizontal plane and 500 lux (46 foot-candles) of lighting in the vertical plane measured at 1 meter (3.28 feet) above the finished floor
- D. 50 lux (4.6 foot-candles) of lighting in the horizontal plane and 20 lux (1.9 foot-candles) of lighting in the vertical plane measured at 1 meter (3.28 feet) above the finished floor
Answer: A
NEW QUESTION 137
One interior TTY must be provided at locations defined as public accommodations with ________ or more pay telephones.
- A. Four
- B. One
- C. Six
- D. Eight
- E. Two
Answer: A
NEW QUESTION 138
A voice over IP network that converges voice capabilities with softphones. Video communications, instant messaging is referred to as
- A. mesh communications services
- B. unified fabric architecture
- C. converged communications
- D. unified communications.
- E. Ethernet network communications
Answer: D
NEW QUESTION 139
An ICT distribution designer is designing a backbone cabling network that is specified for a campus network including several links approaching 2000 m (6562 It) and data rates of 100 Gb/s What optical fiber type(s) should be used?
- A. Both OS2 and OM3 fiber
- B. Both OS1 and OS2 fiber
- C. OM4 fiber
- D. OM3 fiber
Answer: B
NEW QUESTION 140
For a cost estimate, an ICT distribution designer should produce a document listing each task with a cost placed beside them. The type of document used is a
- A. SoW.
- B. worksheet
- C. spare ad sheet
- D. database
Answer: A
NEW QUESTION 141
An organization must accelerate a product to market. The program manager completes the preliminary program slaps and holds a kick-off meeting Project managers submit their preliminary schedules for review What should the program manager do next?
- A. Integrate the project schedules into the program schedule and report the revised delivery date to the project managers
- B. Assign resources lo the schedule and report the revised delivery date to the project managers
- C. Revise the project schedules to meet the program schedule and communicate to stakeholders
- D. Work with the project managers to refine the project schedules and deliverables to align with the program milestones
Answer: C
NEW QUESTION 142
Which two of the following are ADVANTAGES of underground conduit systems? (Select two options.)
- A. Require more installation time than aerial or direct-buried installations
- B. Not adaptable for future facility placement or removal without disturbing the property
- C. Route planning is not as critical as aerial or direct-burial
- D. Economical over a long life
- E. Provide additional physical cable protection
Answer: D,E
NEW QUESTION 143
Which requirement does the ICT distribution designer provide to the Mechanical Engineer in charge of the HVAC design for a Telecommunication Space?
- A. Location and size of condensate drain
- B. The quantity and size of HVAC vents needed for the room
- C. Location of the telecommunications own dedicated electrical distribution panel
- D. The heat load (BTU (calories/hour) of all equipment installed within the space
Answer: D
NEW QUESTION 144
A program to implement a new payroll processing system at a healthcare company is nearing completion and is under budget. What should the program manager do next?
- A. Apply the remaining budget to deferred enhancement requests
- B. Apply the remaining budget to operational activities
- C. Present additional opportunities to the program sponsor
- D. Request permission from the program governance board to initiate program closure activities
Answer: D
NEW QUESTION 145
Which type of protection for electrical power stations provide isolation against a rise in potential of station ground and also provide drainage protection against longitudinally-induced voltages?
- A. Unit-type neutralizing transformers
- B. Isolating transformers
- C. 2-winding neutralizing transformers
- D. Mutual drainage reactors
- E. Neutralizing transformers
Answer: B
NEW QUESTION 146
To properly size and provide accurate cost estimates for a communications distribution horizontal pathway that will include BAS system infrastructure, the designer should provide ________ for every BAS outlet or device based on total floor area.
- A. 91.40 m2 (300 ft2)
- B. 152.40 m2 (500 ft2)
- C. 23.20 m2 (250 ft2)
- D. 9.30 m2 (100 ft2)
Answer: C
NEW QUESTION 147
In which phase of the protect design would an ICT distribution designer be expected to prepare preliminary cost estimates?
- A. PD
- B. SD
- C. CD
- D. DD
Answer: B
NEW QUESTION 148
A program manager takes over a global program from another program manager. Upon arriving on-site, the program manager immediately sees that stakeholders are upset because of a lack of updates and communications about the program.
What should the program manager do first?
- A. Review the stakeholder engagement plan and stakeholder matrix
- B. Review the program governance plan and communication log
- C. Review the program communications management plan and stakeholder register
- D. Notify the executive sponsor and update the program issue tog
Answer: C
NEW QUESTION 149
Exhibit:
A pay telephone using coins needs to be installed in a public are
a. In the specifications, it is required that the telephone shall meet the ADA (Americans with Disability Act) requirement for side reach using a wheelchair. What will be the maximum reachable height or the value of "X"?
- A. 1170 mm (46 in)
- B. 760 mm (30 in)
- C. 864 mm (34 in)
- D. 1220 mm (48 in)
- E. 1370 mm (54 in)
Answer: E
NEW QUESTION 150
......
Get RCDDv14.1 Actual Free Exam Q&As to Prepare Certification: https://www.actual4dump.com/BICSI/RCDDv14.1-actualtests-dumps.html
BICSI Actual Free Exam Questions And Answers: https://drive.google.com/open?id=1464oRuESoCDl5kZGCcqThIrU8sWF3sAA