NEW QUESTION 135
One of the constituent project managers asks a new program manager to obtain approval for an additional key project requirement. A tolerance range is set, if the tolerance range is too narrow on a program what effect will multiple minor changes have on the program?

  • A. Degradation of program communications
  • B. Reduction in program quality
  • C. Reduction in program risk
  • D. Slow down in program implementation

Answer: D

 

NEW QUESTION 136
What is the MINIMUM lighting requirement for telecommunications spaces?

  • A. 500 lux (46 foot-candles) of lighting in the horizontal plane and 200 lux (18.6 foot-candles) of lighting in the vertical plane measured at 1 meter (3.28 feet) above the finished floor
  • B. 500 lux (46 foot-candles) of lighting in the horizontal plane and 500 lux (46 foot-candles) of lighting in the vertical plane measured at 1 meter (3.28 feet) above the finished floor
  • C. 200 lux (18.6 foot-candles) of lighting in the horizontal plane and 500 lux (46 foot-candles) of lighting in the vertical plane measured at 1 meter (3.28 feet) above the finished floor
  • D. 50 lux (4.6 foot-candles) of lighting in the horizontal plane and 20 lux (1.9 foot-candles) of lighting in the vertical plane measured at 1 meter (3.28 feet) above the finished floor

Answer: A

 

NEW QUESTION 137
One interior TTY must be provided at locations defined as public accommodations with ________ or more pay telephones.

  • A. Four
  • B. One
  • C. Six
  • D. Eight
  • E. Two

Answer: A

 

NEW QUESTION 138
A voice over IP network that converges voice capabilities with softphones. Video communications, instant messaging is referred to as

  • A. mesh communications services
  • B. unified fabric architecture
  • C. converged communications
  • D. unified communications.
  • E. Ethernet network communications

Answer: D

 

NEW QUESTION 139
An ICT distribution designer is designing a backbone cabling network that is specified for a campus network including several links approaching 2000 m (6562 It) and data rates of 100 Gb/s What optical fiber type(s) should be used?

  • A. Both OS2 and OM3 fiber
  • B. Both OS1 and OS2 fiber
  • C. OM4 fiber
  • D. OM3 fiber

Answer: B

 

NEW QUESTION 140
For a cost estimate, an ICT distribution designer should produce a document listing each task with a cost placed beside them. The type of document used is a

  • A. SoW.
  • B. worksheet
  • C. spare ad sheet
  • D. database

Answer: A

 

NEW QUESTION 141
An organization must accelerate a product to market. The program manager completes the preliminary program slaps and holds a kick-off meeting Project managers submit their preliminary schedules for review What should the program manager do next?

  • A. Integrate the project schedules into the program schedule and report the revised delivery date to the project managers
  • B. Assign resources lo the schedule and report the revised delivery date to the project managers
  • C. Revise the project schedules to meet the program schedule and communicate to stakeholders
  • D. Work with the project managers to refine the project schedules and deliverables to align with the program milestones

Answer: C

 

NEW QUESTION 142
Which two of the following are ADVANTAGES of underground conduit systems? (Select two options.)

  • A. Require more installation time than aerial or direct-buried installations
  • B. Not adaptable for future facility placement or removal without disturbing the property
  • C. Route planning is not as critical as aerial or direct-burial
  • D. Economical over a long life
  • E. Provide additional physical cable protection

Answer: D,E

 

NEW QUESTION 143
Which requirement does the ICT distribution designer provide to the Mechanical Engineer in charge of the HVAC design for a Telecommunication Space?

  • A. Location and size of condensate drain
  • B. The quantity and size of HVAC vents needed for the room
  • C. Location of the telecommunications own dedicated electrical distribution panel
  • D. The heat load (BTU (calories/hour) of all equipment installed within the space

Answer: D

 

NEW QUESTION 144
A program to implement a new payroll processing system at a healthcare company is nearing completion and is under budget. What should the program manager do next?

  • A. Apply the remaining budget to deferred enhancement requests
  • B. Apply the remaining budget to operational activities
  • C. Present additional opportunities to the program sponsor
  • D. Request permission from the program governance board to initiate program closure activities

Answer: D

 

NEW QUESTION 145
Which type of protection for electrical power stations provide isolation against a rise in potential of station ground and also provide drainage protection against longitudinally-induced voltages?

  • A. Unit-type neutralizing transformers
  • B. Isolating transformers
  • C. 2-winding neutralizing transformers
  • D. Mutual drainage reactors
  • E. Neutralizing transformers

Answer: B

 

NEW QUESTION 146
To properly size and provide accurate cost estimates for a communications distribution horizontal pathway that will include BAS system infrastructure, the designer should provide ________ for every BAS outlet or device based on total floor area.

  • A. 91.40 m2 (300 ft2)
  • B. 152.40 m2 (500 ft2)
  • C. 23.20 m2 (250 ft2)
  • D. 9.30 m2 (100 ft2)

Answer: C

 

NEW QUESTION 147
In which phase of the protect design would an ICT distribution designer be expected to prepare preliminary cost estimates?

  • A. PD
  • B. SD
  • C. CD
  • D. DD

Answer: B

 

NEW QUESTION 148
A program manager takes over a global program from another program manager. Upon arriving on-site, the program manager immediately sees that stakeholders are upset because of a lack of updates and communications about the program.
What should the program manager do first?

  • A. Review the stakeholder engagement plan and stakeholder matrix
  • B. Review the program governance plan and communication log
  • C. Review the program communications management plan and stakeholder register
  • D. Notify the executive sponsor and update the program issue tog

Answer: C

 

NEW QUESTION 149
Exhibit:

A pay telephone using coins needs to be installed in a public are
a. In the specifications, it is required that the telephone shall meet the ADA (Americans with Disability Act) requirement for side reach using a wheelchair. What will be the maximum reachable height or the value of "X"?

  • A. 1170 mm (46 in)
  • B. 760 mm (30 in)
  • C. 864 mm (34 in)
  • D. 1220 mm (48 in)
  • E. 1370 mm (54 in)

Answer: E

 

NEW QUESTION 150
......