
[Jan 27, 2022] C_TS422_1909 Practice Exam Dumps - 99% Marks In SAP Exam
Updated Verified C_TS422_1909 Q&As - Pass Guarantee or Full Refund
NEW QUESTION 25
What are the consequences when you assign a planned order to a production line manually, using the planning table in repetitive manufacturing?
- A. The planned order is converted to a production order.
- B. The planned order's components are copied from the picking list.
- C. The planned order's component availability is checked
- D. The planned order generates capacity requirements.
Answer: D
NEW QUESTION 26
Which of the following is a valid sequence of the main activities in product on order processing?
- A. Creation, scheduling, release, variance calculation, confirmation
- B. Creation, release, scheduling, material withdrawal, confirmation
- C. Creation, staging, release, material withdrawal, confirmation
- D. Creation, scheduling, release, material withdrawal, confirmation
Answer: D
NEW QUESTION 27
In a first step you have created master recipes. In which sequence are the additional objects created?
Please choose the correct answer.
Response:
- A. Process order
Control recipe
PI sheet
Process message - B. Process message
Control recipe
Process order
Process message
PI sheet - C. Control recipe
Process order
PI sheet - D. Process order
Control recipe
Process message
PI sheet
Answer: A
NEW QUESTION 28
In order to use strategy 70 - Planning At Assembly Level, what order field must be set besides the planning strategy?
Please choose the correct answer.
Response:
- A. Dependent Requirements indicator
- B. Individual/Collective Indicator
- C. Storage Location MRP Indicator
- D. Mixed MRP indicator
Answer: D
NEW QUESTION 29
Which time elements are relevant for lead t me scheduling of a product on order? Note: There are 2 correct answers to this question.
- A. Planned delivery time
- B. Setup time
- C. Total replenishment lead time
- D. Float after production
Answer: A,D
NEW QUESTION 30
You want to set up a make-to-order planning scenario for a finished material. Some components from the bill of materials (BOM) should be procured per sales order, other components should be procured for various requirements. Fore casting is NOT possible. Which settings do you make to achieve this?
- A. Planning strategy 50 (Planning without final assembly) and the corresponding individual Collective Indicator.
- B. Planning strategy 20 (Make-to-Order) and the corresponding Mixed MRP indicator
- C. Planning strategy 20 (Make-to-Order) and the corresponding individual Collective indicator
- D. Planning strategy 50 (Planning without final assembly) and the corresponding Mixed MRP indicator
Answer: A
NEW QUESTION 31
Why would you use phantom assemblies? Note: There are 3 correct answers to this question.
- A. To make the assignment of components easier
- B. To reduce the number of changes required in bills of material
- C. To increase the number of planning levels
- D. To simplify the structure of bills of material
- E. To reduce the number of material masters
Answer: A,B,D
NEW QUESTION 32
You want to triggering-house production of a semi-finished mater al before a sales order for the corresponding finished good is received. Which planning strategy supports the consumption of planned independent requirements for the semi-finished material?
- A. Planning at assembly level (70)
- B. Planning with final assembly (40)
- C. Make-to-order production (20)
- D. Planning without final assembly (50)
Answer: D
NEW QUESTION 33
Which time elements can be reduced by a reduction strategy? Note: There are 3 correct answers to this question.
- A. Wait time
- B. Goods receipt processing time
- C. Queue time
- D. Float after production
- E. Move time
Answer: C,D,E
NEW QUESTION 34
Which of the following are capabilities of multidimensional reporting in SAP S/4HANA embedded analytics?
There are 3 correct answers to this question.
Response:
- A. Scheduling
- B. Sort
- C. Filters
- D. Forecast
- E. Drilldown
Answer: B,C,E
NEW QUESTION 35
In which material master views can you select the batch management checkbox?
There are 2 correct answers to this question.
Response:
- A. Basic Data 1
- B. MRP 4
- C. Purchasing
- D. Work Scheduling
Answer: C,D
NEW QUESTION 36
The setup time on the production line to produce a material is extensive. You would like to avoid multiple setups and limit the production of the material based on a planning calendar.
Which type of lot size procedure should you use to accomplish this?
Please choose the correct answer.
Response:
- A. Exact lot sizing
- B. Minimum lot sizing
- C. Periodic lot sizing
- D. Fixed lot sizing
Answer: C
NEW QUESTION 37
Which Kanban master data object controls the relationship between the supply and demand source?
Please choose the correct answer.
Response:
- A. Rate routing
- B. Kanban container
- C. Control cycle
- D. Production supply area
Answer: C
NEW QUESTION 38
What does it mean for the production planner when MRP works with infinite capacities?
- A. MRP assigns capacity requirements automatically to work center is with the earliest available capacity.
- B. MRP assigns capacity requirements automatically after the last scheduled order on a work center.
- C. MRP creates capacity requirements only if the work center has sufficient capacity.
- D. MRP creates capacity requirements without checking the capacity of a work center.
Answer: D
NEW QUESTION 39
Which data object can be updated with the scheduling results of a routing?
Please choose the correct answer.
Response:
- A. MRP profile
- B. Material master
- C. Production scheduling profile
- D. Production version
Answer: B
NEW QUESTION 40
The SAP Kanban procedure could be used to trigger which of the following kinds of replenishment?
There are 2 correct answers to this question.
Response:
- A. Vendor consignment
- B. In-house production
- C. Subcontracting
- D. Stock transfer
Answer: B,D
NEW QUESTION 41
Which master data object governs the relationship between supply source and demand source in the Kanban process?
- A. Rate routing
- B. Control cycle
- C. Replenishment strategy
- D. Production supply area
Answer: B
NEW QUESTION 42
The material master of your finished product contains MRP type "PD". You set a manual firming date in the stock requirements list. Which of the following will firm planned orders" There are 2 correct answers to this question.
Response:
- A. Creating a planned order within the planning time fence
- B. Assigning a production scheduling profile
- C. Setting a planning time fence in the Material Master Record
- D. Manually changing the quantity of a planned order
Answer: A,C
NEW QUESTION 43
MRP created a planned order for a material that has one single material from stock as a component. What happens to this dependent requirement when you convert the planned order into a production order?
- A. It is converted into a schedule line.
- B. It is converted into a production order.
- C. It is converted into a reservation.
- D. It is converted into a planned order.
Answer: C
NEW QUESTION 44
How Is the bill of material (BOM) exploded when you use a BOM explosion number?
Please choose the correct answer.
Response:
- A. With respect to a defined separate change status for product and each assembly
- B. With respect to a common change status for product and each assembly
- C. With respect to defined separate key dates for product and each assembly
- D. With respect to a common key date for product and each assembly
Answer: C
NEW QUESTION 45
......
C_TS422_1909 Real Valid Brain Dumps With 91 Questions: https://www.actual4dump.com/SAP/C_TS422_1909-actualtests-dumps.html