NABCEP PVIP certification exam is designed for professionals who have experience in the installation of PV systems. It is a challenging exam that requires a deep understanding of electrical and mechanical systems, as well as a thorough knowledge of safety practices and regulations. PVIP exam covers a range of topics, including system design, installation, commissioning, and maintenance.
NEW QUESTION # 18
An installer troubleshooting a ground-mounted array finds It to be performing as expected most of the time, but a ground-fault error is indicated on hot days. The inverter is in a shaded location. Which of the following should theinstaller check for FIRST when troubleshooting this array?
- A. Intermittent ground connections
- B. Pinched module wiring
- C. Loose module connections
- D. High voltage
Answer: B
NEW QUESTION # 19
Which of the following MUST be referenced for determining a site's design wind speed?
- A. The module manufacture's design wind speed
- B. The ASHRAE Handbook_fundamentals in effect
- C. The NEC version in effect
- D. The jurisdiction's local building code in effect
Answer: B
NEW QUESTION # 20
A ground resistance measurement on a newly installed grounding electrode indicates a resistance of 130. The earth connection may be improved by connecting the existing electrode to a:
- A. Supplemental copper plated steel grounding electrode located 8 ft, away.
- B. Supplemental grounding electrode located 5 ft, away.
- C. Buried water piping system using 40 ft. of 2 in. PVC piping located 10 ft awat.
- D. Supplement 1/4 in, in thick aluminumplate electrode buried 30 in. down and located 7 ft, away.
Answer: A
NEW QUESTION # 21
Aerial lifts used to hoist equipment and PV modules to roof levels may be fieldmodifiedfor uses other than those intended by the manufacturer with which approval or certification?
- A. Tested and approval by the distributor of the equipment
- B. Certified via the state material handling safely statutes
- C. Approval by the local AHJ for meeting safely regulations
- D. Certified in writing by the manufacturer or an NRTL
Answer: C
NEW QUESTION # 22
Which of the following is an NEC requirement regarding access for large-scale PV electric power production facilities?
- A. All fencing and associated gates must have ac and dc current and voltage exposure labvels and must be electrically isolated from the solar facility.
- B. Access to remote isolating equipment for servicing is allowed for individual other than qualified persons when the equipment is enclosed within a secure structure.
- C. Arc flash warning labels must be field-applied by the installer at all access points for qualified persons and at the point of the utility interconnection directory.
- D. Field-applied hazard markings must be installed, and access to the supply station is to be restricted by fencing or other adequate means.
Answer: D
NEW QUESTION # 23
Thermal imaging infrared cameras can be used to help find which of the following system operational issues?
- A. Battery state of charge in a multimode system
- B. Intensity of solar insolation to determine power output
- C. Blind spot fault in a source circuit
- D. Loose PV input circuit terminations in a combiner box
Answer: C
NEW QUESTION # 24
How should stratification be eliminated in a set of large, stationary, stationary flooded lead-acid batteries?
- A. Discharge to 80 depth of discharge.
- B. Add 50% diluted sulfuric acid.
- C. Rotate the battery positions
- D. Enable equalization.
Answer: D
NEW QUESTION # 25
A grid-connected PV system on a dwelling is producing 30% less power than expected. The conductors from threes strings of modules enter into a 3-pole fused dc disconnect, and each ungrounded conductor is connected to a separate pole. On the inverter side of the switch terminals, the three strings are combined. The dc disconnect switch is opened. The voltages on the array side of theswitchare 440 on string #1, 444V on string
#2, and 0V on string #3. The dc disconnect is then closed and the inverter resumes operating, still producing about 30% less power than expected. A clamp-on ammeter is used to measure the dc current of each string of each string of modules where they enter the rooftop junction box. The operating currents of each string are
3.9A for string #1, 3 85A for string #2, and 4.3 A for string #3. What is the MOST likely with the system?
- A. Positive and negative output conductors of string #3 are faulted together.
- B. A ground fault is causing the current from strings #1 and #2 to flow into string #3.
- C. String #3 has an open connection and is not contributing any voltage.
- D. There is lower module mismatch in string #3 than in string #1 and #2.
Answer: A
NEW QUESTION # 26
A PV connection is being made at the center of a 300 ft. long 200 feeder. See the attack diagram. The feeder originates in the upper third of the 800A main service panel (800A main breaker) with a 200A breaker and terminates in a 200A main-lug-only subpanel. The rated output of the PV system inverter is 100A.
Which are the NIMUMUM actions required to achieve an NEC-compliant installation?
- A. Install a 325A breaker at the PV source connection point on the portion of the feeder toward the subpanel. Increase thecapacityof the feeder from the main panel board to 325A breaker to the bottom of the main service panel, away from the 800 main breaker.
- B. Install a 325A at the PV source connection point on the portion of the feeder toward the subpanel, increase the capacity of this portion of the feeder to 325A, add a 200A main breaker to the subpanel, and move the 200A breaker to bottom of the main service panel, away from the 800A main breaker.
- C. Install a 200A breaker at the PV source connection point on the portion of the feeder toward the subpanel, maintain the capacity of the entire feeder, and move the 200A breaker to the bottom of the main service panel, away from the 800A main breaker.
- D. Install a 200A breaker at the PV source connection point on the portion on the portion of the feeder toward the subpanel and move the 200A breaker to the top of the main service panel, adjust to the 800A main breaker.
Answer: A
NEW QUESTION # 27
When installing an ungrounded PV system with an open-circuit voltage of 450Vdc and a maximum voltage of
3000Vdc which procedures should be followed to establish an electrically safe condition?
- A. Mount inverters on nonconductive supports and temporarily ground one dc circuit conductor.
- B. Verify that disconnecting device blades are closed and test conductors using an adequately rated detector.
- C. Apply lockout/tagout devices and install a listed isolation transformer.
- D. Determine possible sources electrical supply an avoid exposure to energized conductors or parts.
Answer: D
NEW QUESTION # 28
A homeowner is concerned that a 6kWdc PV system might be experiencing a performance issue. The homeowner has noticed what appears to be declining production. The installer analyzes the following data acquisition system (DAS) results for each year since the installation:
Given the data, which is the MOST likely conclusion to draw?
- A. There is an intermittent inverter failure that is causing production to be lower than expected and the inverter should be repaired.
- B. The system has experienced above-average degradation and a module warranty claim should be explored.
- C. There is a problem with the DAS because the peak sun hours do not correlate with production values and the das should be repaired.
- D. A combination of normal module degradation combined with cloudy weather has caused lower output in the past few years.
Answer: D
NEW QUESTION # 29
A PV system is located at 41 N latitude. The sun angle is 23 on December 21 at solar noon. Assuming that the
65 ft tree is directly south of the PV array and will grow 20 ft. over the life of the PV system, what is the MNIMUM distance the tree to the button of the prevent shading?
- A. 153 ft.
- B. 201 ft.
- C. 167 ft.
- D. 98 ft.
Answer: B
NEW QUESTION # 30
Which of the following should a PV installer do during dc insulation resistance testing?
- A. Connect the megohmmeters's negative terminal to the dc circuit insulation
- B. Wait until is raining and all wiring is damp to conduct the test.
- C. Remove surge suppression equipment from the circuit being tested.
- D. Close ac and dc disconnects and have the system running for at least 5 minutes before testing.
Answer: A
NEW QUESTION # 31
Which of the following voltages should be included on the dc disconnected label to indicate MAXIMUM system voltage?
- A. Non-temperature-corrected V
- B. Temperature-corrected V
- C. Source circuit V
- D. 600 V
Answer: B
NEW QUESTION # 32
When doinginitial inspections on a PV system that was installed using racking that is not compliant with UL.2703, an inspector should pay special attention to which electrical attribute?
- A. Each PV module needs to be bonded to the equipment grounding conductor.
- B. The equipment grounding conductor must be irreversibly spliced.
- C. Racking needs to be bonded to a supplemental grounding electrode conductor.
- D. The grounding conductor must be bonded directly to the primary grounding electrode.
Answer: A
NEW QUESTION # 33
When performing a system checkout after completing the installation, what is the SAFEST sequence of tasks to detect installation errors before closing any disconnects to the inverter, charge controller, or batteries?
- A. Perform visual inspection, check polarity and measure open-circuit voltage.
- B. Perform visual inspection, install source circuit fuses, and measure open-circuit current.
- C. Perform visual inspection, install source circuit fuses, and measure open-circuit voltage.
- D. Install source circuit fuses, verify that all equipment-grounding conductors are secure, and measure ac line voltage.
Answer: A
NEW QUESTION # 34
A AWG THWN-2 PV output conductors from two PV arrays are run in the same 3 in, conduit to their respective functionally grounded inverters in the building. The three PV source circuits are each protected by a
15A fuse in the combiner box at the array. The conduit, which is strapped directly to the roof,is exposed to design temperatures of 140' F (60'C) during its 30 ft.
Exposed run. What is the MAXIMUM current carrying capability value of the PV output conductors?
- A. 61A
- B. 42A
- C. 54A
- D. 34A
Answer: D
NEW QUESTION # 35
A grid-interactive PV system with battery backup is being installed with a ground-mounted PV array located
200 ft, from the inverter and batteries. The dc PV output circuit has overcuit has overcurrent protection rated from 30A. To reduce voltage drop between the array and batteries, the output circuit wire size was determined to be 6 AWG. The fused dc disconnect between the inverted and batteries is rated for 300A. What is the required size of the equipment grounding conductor between the metal battery case and the inverter?
- A. 8 AWG
- B. 6 AWG
- C. 10 AWG
- D. 4 AWG
Answer: D
NEW QUESTION # 36
Which of the following requires a UL listing or its equivalent?
- A. Lag screws
- B. Grounding electrode clamp
- C. System labels and markings
- D. System manuals
Answer: B
NEW QUESTION # 37
A PV system equipped with rapid shutdown requires a label stating ''RAPID SHUTDOWN SWITCH FOR SOLAR PV SYSTEM''.
Which is the BEST description of where this label is required?
- A. On or within 3 ft. of the ac disconnect
- B. On or within 3 ft. of the ac disconnect
- C. On or within 3 ft. of the ac disconnect
- D. On or within 3 ft. of the ac disconnect
Answer: D
NEW QUESTION # 38
......